Real-Time 3D Graphics Simulation for Computer Numerical Control
| G54-G59 WORKPIECE COORDINATE SYSTEM | |
|
N_ G54 through G59 |
| The G54 – G59 commands are used to reposition the origin per a user- defined working coordinate system. | |
| Example G54 | |
| % | (PROGRAM START FLAG) |
| :1019 | |
| N5 G90 G80 G20 | |
| N10 M06 T6 | |
| N15 M03 S1300 | |
| N20 G55 G00 X1.0 Y1.0 | (Rapid to X1, Y1 of work coordinate system 2) |
| N25 Z0.5 | |
| N30 G82 Z-0.25 R0.125 P500 F5 | |
| N35 Y2 | |
| N40 X2 | |
| N45 Y1 | |
| N50 X1.5 Y1.5 | (COMPENSATE TOOL 4 -- 0.25 INCHES) |
| N60 G80 G00 Z1 | |
| N65 G56 G00 X1.0 Y1.0 | (Rapid to X1, Y1 of work coordinate system 3) |
| N70 Z0.5 | |
| N75 G82 Z-0.25 R0.125 P500 F5 | |
| N80 Y2 | |
| N85 X2 | |
| N90 Y1 | |
| N95 X1.5 Y1.5 | |
| N100 G80 G00 Z1 | |
| N102 G54 | (Reset work coordinate system) |
| N105 X0 Y0 | |
| N110 M05 | |
| N115 M30 |